-40%

T8120 Welder Infrared Preheating Oven Rework Station

$ 72.28

Availability: 100 in stock
  • All returns accepted: Returns Accepted
  • MPN: Does Not Apply
  • Item must be returned within: 30 Days
  • Return shipping will be paid by: Buyer
  • Brand: Unbranded
  • Condition: New
  • Refund will be given as: Money Back
  • Restocking Fee: No

    Description

    Preheating Oven T8120
    1. The machine selects the infrared highly effective component to give off heat which independent exploration, adopt advanced PID intelligent controlling warm heating technology, controls warm precisely.
    2. Can achieve to heat PCB board and component which contains lead or not,especially suit to BGA?SMD.
    3. Use infrared heat, easy to cut through, heat proportion, don’t have sirocco flow. Don’t shift the small component on the PCB board,ensure the welding quality.
    4. This machine has 600W heating system, widely to 120x120mm.Can use with the handhold infrared welder T-835.
    5. Easily operate, can operate it through easy training.
    Work floor size
    200x240mm
    Rated voltage and frequency
    AC220-230v/AC110V   60/50Hz
    Complete machine power
    800W
    Preheating chassis power
    600W
    Preheating chassis size
    120x120mm
    Preheating chassis temperature adjustable
    0-450?
    Main Component:
    Preheating oven main body
    1
    Temperature sensor
    1
    Board support of the circuit
    1
    Power line
    1
    User manual (compact disc)
    1
    Operation instructions:
    1. Starting and inspects before starting:
    ?Check the temperature sensor and the power line.
    ?Turn on the power line. Don’t use until passing check. (The nixie tube displays the indoor temperature.)
    ?The black switch on the front panel use to control the infrared preheating chassis; press “?”up,“?”down,can be at 0-450?,adjust the infrared preheating chassis’s temperature. Press the button“WARM”,the infrared preheating chassis starts to work, press“COOL”,it stops working.
    2.Operation of preheating PCB board:
    (1) PCB board’s placement and adjustment:
    ?According to the PCB board’s size, adjust the location of the board support, put the PCB board on the support and fix the screw tightly with hands. Make the temperature measurement head fixed on the PCB board which needs to preheating, use aluminum-foil paper or adhesive paper to stick tightly.
    ?According to the size of PCB board and welding technological requirement, press “?”and “?”button, between 0? and 450?, regulate the output temperature of preheating chassis.
    (2) Preheating opening and closure:
    ?Press the “WARM” button,open the preheating chassis about 3-5 minutes, make the temperature be about the setting value then carry on the step operation.
    ?After finishing ,press “COOL”, the preheating chassis stop working.
    Attention:This time can’ t close the power switch, after the machine full cooling then close the power source.
    ?General preheating temperature establishment suggestion: when PCB board has lead ,may adjust the infrared preheating chassis temperature to 100-120? ; When PCB board has non-lead, may adjust  to 120-140? ; Also may set the different preheating temperature voluntarily according to user's use craft and experience.
    3. Machine installation and adjustment:
    This infrared preheating chassis heating way includes: The total pressure flow-through heating way and the PID percentage adjustment way, you may adjust voluntarily according to the PCB board’s preheating allowance. The general suggestion preheating temperature is lower than 250?, selects the PID percentage adjustment method; The preheating temperature is higher than 250?, use the total pressure flow-through heating way.
    Adjustment method:
    1.press “?”power-on, display: C=?
    2.press “?”choose 0 or 1,every press the status change one time, C=0 is PID percentage adjustment, C=1 is switching control.
    Caution!
    1. After finishing, don’t turn off the power immediately; make the infrared preheating chassis full cooling.
    2. Keep the ventilation free-flowing, the infrared preheating chassis pure; use the dehydrated alcohol to be clean regularly!
    3. Careful, the high temperature operation, pay attention, avoids scalding.
    4. Long-time doesn’t use, should cramp out the power source plug!
    Guarantee acceptance
    The complete machine maintains for one year and lifelong service. Long-term factory price supply .Provides the immediate network online Q/A and the technical advisory work service.
    Statement
    Between user operating manual and actual product different place, take actual product as!
    ONE YEAR WARRANTY!!
    The item will be
    shipped from
    China
    . Any customs tax applied to this package should be covered by buyers. The price does not include any customs tax.
    Summary of My Selling Policies
    INTERNATIONAL SHIPPING NOTICE
    1. Import  duties, taxes and charges are not included in the item price or  shipping charges. These charges are the buyer’s responsibility.
    2. Please check with your country’s customs office to determine what these additional costs will be prior to bidding/buying.
    3. Your valid phone number are the must for the shipping; otherwise we can't guarantee the package would arrive smoothly.
    4. Multiple purchases are welcomed. We will combine the shipping fee for you.
    PAYMENT:
    1. we accept: Paypal .
    We  will very appreciate if you can pay for the order after you ordering it  in 1-3 working days so that we can provide you the best services.
    SHIPPING METHODS:
    1. We will ship your item by FedEx, DHL, UPS, EMS,YANWEN, e- Package  etc with the tracking number showed on ebay.
    Your item will be shipped in 3-5 working days after your payment is cleared.
    The  shipping time is 5-12 working days. Due to the local dispatch or other  reasons, sometimes the shipping time will be delay. Please kindly  understand Uncertainties by the delivery company. We will track the item  all the time until it is reached to you.
    RETURN POLICY:
    1.  Return accepted in 30  days after the item reached to you. The buyer  need to afford the return postage fee who also need to return it to our  designated place.
    2.  Return package must be in the original packaging, everything must be in  new condition. Missing parts or any damaged by the buyer will not  qualify for any refund.
    3. Within  warranty period, all exchanges or repair parts due to the defects are  free. But buyer is responsible for shipping charges.
    ABOUT US
    If  you have a question or concern before or after receiving your item,  please do not hesitate to contact our customer service team by clicking  on the "Ask a question" link in the bottom left.
    Your satisfaction is guaranteed